Pipe stub outs are the sections of pipe that feed from the lines run underneath a slab or building through the slab then connect to appliances or eventually continue on to the upper levels of your building.
Pipe sleeve through concrete slab.
They can be telescoped or cut for any slab thickness by cutting off the flange and stacking them to the desired height so both pieces can be removed once the concrete has cured.
Water supply sewer line below garden area driveway.
The cement bond pipe sleeve can be set in concrete block walls or cast in a wall opening with mortar.
Exceptions are granted in cases where the service will obviously be covered deep enough at final grading.
Pipe penetration thru roof detail.
The coating bonds perfectly to the wall sleeve and adheres homogeneously with the concrete.
For water services we require a pipe sleeve that is either underneath the footing or placed in the footing in such manner that the sleeve exits the structure at or below the frostline.
Pipes passing through wall concrete.
All copper pipes projecting through or under slabs are required by code to be sleeved in plastic and joints sealed by tape.
Crete sleeve is easily removable because concrete will not stick to high density polyethylene.
Crete sleeve plastic hole forms are used by electricians plumbers hvac and concrete providers to create a hole in a concrete wall or floor so they can run their conduit and piping from one wall or floor to the next.
Pipe sleeve thru floor slab.
Additional foam insulation may be used also but should be sleeved since the foam can adsorb moisture from the ground which will eleminate the insulating effects of the foam.
Cement bonding pipe sleeves are available from westatlantic tech corp.
Typical fixture connection detail thru wall.
Detail of cleanout at a high level.